Environmental Impact Reports (EIR)

If the Lead Agency finds that the project may have a significant impact on the environment and that there are no obvious measures the applicant can take to mitigate potential problems, an EIR will be required. An EIR may also be required if further study is needed to provide information necessary in determining whether or not the project could have a significant impact.




Case Number PL13-0101
Bill Camarillo c/o Agrominl, Applicant

Notice of Availability and Intent to Certify an EIR

Project Description:  Modification to Conditional Use Permit 5001-1 for the continued operation of the Agromin Facility until March 23, 2019, a revised CUP boundary, an increase in onsite feedstock and compost storage, installation of a Solid Waste Dry Anaerobic Digestion System (i.e. SmartFerm provided by ZeroWaste Energy, LLC), and facility improvements (i.e. fire hydrants, stormwater management, interior access roads).

List of Potentially Significant Environmental Impacts Identified:

Agricultural Resources, Air Quality, Aviation Hazards, Biological Resources, Scenic Resources, Noise and Vibration, Public Health and Nuisance, Water Resources

Location: 
6859 Arnold Road, Oxnard
APNs: 231-0-040-315, 231-0-080-085, 231-0-080-070, and 231-0-040-165

Review Period Start and End Date:  
October 27, 2017 to December 11, 2017

Case Planner:
John Oquendo, john.oquendo@ventura.org, (805) 654-2469

Document